Home/News/

Drive-Thru and Retail Building Construction

Industry News

Retail and Roadside Buildings: Programme and Structure for a Unit or Drive-Thru

Published

November 16, 2026

Read time

5 min

Drive-thru order point canopy beside a roadside retail building

Photo: RDNE Stock project / Pexels.

Retail and roadside buildings are built to tight programmes and repeatable operator specifications. Steel frames suit them because the structure is fabricated off site and erected quickly, so the shop or restaurant can open sooner. The work to plan early is drainage, highways access, glazing and services.

What makes retail and roadside different

A retail unit, convenience store, drive-thru or petrol forecourt building has to open on a date. Delays cost trading days, and the operator often has a standard specification that must be met on every site. So the building process is judged on programme certainty and on how well it follows the operator's design.

Why a steel frame is used

Steel is made in a workshop and delivered ready to assemble, so the structure goes up in days once the foundations are ready. The frame gives clear floor space for shelving or kitchens, supports large glazed shopfronts, and can carry canopies and roof plant. The building can also be extended or altered when the operator's needs change.

Following an operator specification

Operators issue drawings and details for fascias, shopfronts, kitchen and plant areas, and services. A contractor must fit the frame and envelope to those details. The frame is then set out to suit the shopfronts, canopies and equipment those details call for.

Planning, highways and drainage

Many roadside sites depend on highways access and planning conditions. Drainage needs particular care. Where a site includes vehicle areas, car parks or refuelling, surface water may need to pass through an oil separator before it leaves the site. GOV.UK guidance says car parks larger than 800 square metres or with 50 or more spaces, vehicle maintenance areas, roads and refuelling facilities are typical places where an oil separator may be needed, so the drainage design should be settled early.

Programme

A typical sequence is site preparation, drainage and foundations, steel frame, envelope and glazing, services and fit-out by the operator's team, then external works. Because the shopfitter often follows closely, the contractor's handover dates matter. Weather-tight dates should be fixed early and agreed with the operator.

MSB experience

MSB has built retail developments, including a new Tesco Express retail development. See the retail and roadside industry page and the Tesco Express project.

Questions to ask a contractor

  • Can you show completed retail or roadside buildings of this type?
  • How will you manage the operator's specification and approvals?
  • What is your programme from foundations to handover?
  • Who is responsible for drainage, glazing and external works?

Our guides to design and build contracts and checking a contractor help you compare bids.

Glazing, canopies and the customer entrance

A shopfront is the face of a retail building. The frame must be set out to take large panes of glass and a canopy, with the loads and fixings agreed early. Roadside buildings often add a canopy over a drive-thru lane or entrance, and these need foundations and structure of their own. The detail around doors and thresholds also matters for accessibility, so the design should follow the relevant Building Regulations and the operator's standards.

Services and equipment

Kitchens, cold rooms, tills and signage all need power, ventilation and data routes. Plant may be on the roof or in a yard, and the frame must carry it. Agreeing these with the operator before the steel is made avoids cutting holes later. Our steel frame building cost guide explains how services and frame choices affect cost.

Extending or altering a unit

Retailers change their layouts. A steel frame can be extended or altered more easily than many other forms of construction, particularly if the original design allowed for it. Our guide to steel buildings, types, spans and cost describes the frame options, and over-cladding or replacing an old roof covers refurbishing existing units.

Programme risks to plan for

Roadside buildings share a few common risks. Planning conditions may need discharging before work starts. Utility connections, such as electricity and water, can take longer than the building itself. Highways works and temporary traffic management may need separate approvals. And the operator's fit-out team may need access earlier than planned. A good contractor lists these at the start, assigns each an owner and a date, and reports on them weekly.

Health, safety and neighbours

A live roadside or town-centre site needs careful management. Secure fencing, safe pedestrian routes, controlled deliveries and sensible working hours protect the public and the neighbours. The principal contractor has duties under the Construction (Design and Management) Regulations 2015 to plan and manage health and safety during construction. Our article on how to check a contractor explains what to look for.

Quality and finish

Retail buildings are judged on the finish as much as the frame. Cladding lines, shopfront alignment, floor flatness and clean junctions all affect how the building looks and works. Agree trial areas and quality standards with the operator before the main works start. A single contractor responsible for frame, envelope and finishes has more control over these details than a chain of separate trades.

Costs to discuss at the start

Prices depend on size, specification, site conditions and programme. Ask for a clear breakdown of frame, envelope, glazing, groundworks, drainage and external works, and for the items the operator will supply. Different bidders will make different assumptions, so list them and compare like with like. A fixed price is only as good as the scope behind it.

Questions we get asked

Why use a steel frame for a retail unit?

It is fabricated off site, erected quickly, gives clear floor space and supports large glazing, so the unit can open sooner.

Does a drive-thru need special drainage?

Where there are vehicle areas, surface water may need to pass through an oil separator. Settle drainage early with the designer and the water company.

Can the contractor follow an operator's standard design?

Yes. The contractor fits the structure and envelope to the operator's details.

How long does a retail build take?

It depends on the size and site. Ask for a dated programme from foundations to handover.

Can the building be extended later?

Steel frames can usually be extended.

Related service

Retail & Roadside

Fast-programme steel framed retail and roadside buildings.

Let’s deliver your next large-scale project together.

Contact Us
Contact Us