MSB Group acts as principal contractor on steel frame construction projects across the UK, managing fabrication, groundworks and erection as one team.
A steel building is only as good as the construction team managing it. When the principal contractor and the steel fabricator are different companies, delays fall between the cracks. MSB Group acts as principal contractor on steel frame construction projects across the UK - we fabricate the steel, manage groundworks, erect the frame and coordinate every trade on site.
“Steel arrives on site when foundations are ready - because we manage both.”

Construction phase plan, site welfare and statutory notifications under the CDM Regulations 2015.

In-house fabrication and erection, with no interface between fabrication and site, plus groundworks and foundations aligned with our fabrication lead time.

Roof and wall cladding and industrial doors installed as part of the primary contract, with vetted subcontractors managed within our own programme.
Need a principal contractor for your steel build?
Share your project scope and programme for a construction management discussion.

The Advantage
The biggest risk on a steel construction project is the gap between the fabrication programme and the site programme. Because MSB manages both, steel arrives on site when foundations are ready and erection starts without delay.
No fabrication-to-site gap
Steel arrives when foundations are ready, not before or after.
One team, every trade
Vetted subcontractors managed within our own programme, not coordinated by a separate party.
Full CDM compliance
Construction phase plan, site manager, daily toolbox talks and a site-specific risk register on every project.







.webp)
Manufacturing
Telford, Shropshire
Multi-bay portal frame production building with in-house fabricated steelwork. Delivered on a constrained industrial site with a fixed handover date tied to production ramp-up - zero programme overrun.
Design to handover
In-house fabrication
Commercial
Telford, Shropshire
Complex multi-storey steel structure with MSB-fabricated steelwork, industrial roller shutters and full cladding package. Delivered to a phased handover programme with no delays between phases.
Phased handover
Fabrication to erection
Yes. We regularly take on projects where the architect and structural engineer have already been appointed, working from issued-for-construction drawings.
Yes, including phased working, restricted hours or specific traffic management where required.
MSB produces a construction phase plan for every project, appoints a site manager, conducts daily toolbox talks and maintains a site-specific risk register.
Common questions about our construction management service.
Yes. We regularly take on projects where the architect and structural engineer have already been appointed, working from issued-for-construction drawings.
Yes, including phased working, restricted hours or specific traffic management where required.
MSB produces a construction phase plan for every project, appoints a site manager, conducts daily toolbox talks and maintains a site-specific risk register.